Two generators both labeled 500 kVA can be very different. Learn the four ISO 8528-1 ratings, the 70% load rule and what to ask when you receive a quotation.

You receive two quotations that both say 500 kVA, and one is noticeably cheaper. Before choosing, look for the three letters next to that number. If one offer says ESP and the other says PRP, you are comparing two different classes of machine.
The four abbreviations to know
ISO 8528-1 covers generating sets driven by reciprocating internal combustion engines and divides their output into four ratings:
| Code | Best suited to | Hours per year | Load type | Average daily load |
|---|---|---|---|---|
| ESP | Waiting on standby, running only when the grid fails | 200 | Varying | 70% |
| LTP | Scheduled running at peak times | 500 | Steady | 100% |
| PRP | Main source where the grid is lacking | No cap | Varying | 70% |
| COP | Baseload around the clock | No cap | Nearly constant | 100% |
On any given set, the ESP number is always larger than the PRP number, because its assumed working conditions are much lighter. That is why a quotation showing ESP can look "stronger" when the machine is not.
The 70% rule in practice
Under ESP and PRP, a set may touch its rating for short periods, but its average across the day should stay at or below 70%. Take a 200 kW Prime machine: peaks can reach 200 kW, while the average load should not exceed 140 kW.
Ignore this and the generator will seem perfectly fine for the first few weeks, while in reality it is working harder than it was designed to for a long period.
What about the 10% overload?
For diesel Prime sets, Caterpillar and Cummins documents allow 10% extra in an emergency, with two limits: only 1 hour in any 12-hour cycle, and no more than 25 hours in a year. The other three ratings have no such margin, and even on Prime it should never be treated as everyday capacity.
A quick way to choose
- Reliable grid, machine mostly waiting: start from ESP.
- Construction sites, islands, areas with frequent outages: PRP.
- Deliberately running to avoid peak tariffs with an even load: consider LTP, or Prime if the manufacturer recommends it.
- Demand almost flat day and night: COP.
Only after choosing the rating should you calculate capacity from the total load, including the starting current of lifts, pumps and other motors. With a figure in hand, compare it with the ranges of industrial generators or home generators.
Three questions for your supplier
- Which ISO rating does this number follow? On some catalogues in Vietnam, the phrase "continuous power" actually means Prime rather than COP.
- Do both quotations use the same rating? If they differ, ask for them to be restated on one basis before comparing prices.
- Will the warranty still apply to the way I plan to run it? Using a Standby set as the main source goes beyond its design conditions, so read the manufacturer's terms carefully.
Beyond ISO, individual manufacturers also name their own ratings, such as Mission Critical or a 500-hour Standby from Caterpillar and Data Center Continuous from Cummins. When you meet one of these, check that manufacturer's own documentation.
Sources
- Caterpillar: Understanding Generator Set Ratings (LEXE0047)
- Cummins: Understanding ISO 8528 Generator Set Ratings