Before asking anyone for a price, walk over to the main switchboard and read the nameplate on the biggest machine in the building. A few minutes will tell you what kind of generator you are shopping for. If the plate says 380V, 3~ or 3PH, that equipment needs a three-phase supply. If the board carries three phase conductors, the site already runs on a three-phase system.

Signs that you need three-phase

  • Industrial pumps, air compressors, large fans or CNC machines driven by three-phase motors.
  • A lift, central air conditioning or a chiller.
  • A total load so large that putting it on one phase would demand very heavy cables and switchgear.

Homes that only use 220V appliances generally do not need one. If you are unsure, photograph the nameplates and the panel and send them to a technician.

What actually differs

As Fluke explains, three-phase power consists of three signals offset by 120 electrical degrees, which delivers power more evenly and suits heavy loads. In Vietnam, a three-phase four-wire set normally provides 380/220V: motors take 380V, while lights and sockets draw 220V between one phase and neutral.

Worked example: a workshop with 40 kW running at once

The formula is kVA = √3 × V × A ÷ 1,000. If you know the load in kW, divide by the power factor, typically 0.8 for industrial sets.

Step Calculation Result
Convert 40 ÷ 0.8 50 kVA
Current per phase 50,000 ÷ (1.732 × 380) About 76 A
Add a 20% margin 50 × 1.2 60 kVA
Rated current at 60 kVA 60,000 ÷ (1.732 × 380) About 91 A

For this load, a 60 kVA / 48 kW machine such as the FPT TF60 is a sensible starting point. Remember that a large motor started direct-on-line can draw several times its rated current. In that case, recalculate or use a soft starter or inverter. More detail is available in this guide on how to calculate generator capacity and in DOEEET's kVA reference.

Three common commissioning mistakes

Unbalanced phases. Piling 220V loads onto a single phase can overload it even while total capacity remains available.

Wrong phase sequence. Motors may spin backwards, so verify the rotation before connecting.

No suitable changeover panel. An ATS transfers the supply properly and prevents backfeeding into the grid.

Reference capacity levels

Need Models
Small three-phase loads, petrol HK16000TDX OP 12.5 kVA
Small workshops Yanmar YMG18TL 12.5 kVA, Kubota TK20TL 20 kVA
Medium workshops FPT TF60 60 kVA, Cummins India 82.5 kVA, Cummins India 100 kVA
Factories and buildings Cummins India 200 kVA, Cummins India 400 kVA

The full range is listed on the industrial generators page.